You don't have javascript enabled. Good luck with that.
Pencarian
DKI Tambah 2 Genset di Rumah Pompa Waduk Pluit

City to Add 2 Gensets in Pluit Reservoir Pump House

Jakarta Dept. of Industry and Energy added two new gensets for Pluit Reservoir, Penjaringan, North Jakarta.

In last rainy season, there were only 4 pumps operated due to limited genset power.

Each gensets has 2,275 kilo volt ampere (kva) power and able to operate 10 pumps when the electricity connection is off.

Pump House at Jalan Kartini Raya Equipped with Water Processing Tools

Elisabeth Ratu RA, Head of Electricity, Oil and Gas Energy Management for Jakarta Dept. of Industry and Energy, said the gensets will maximize the existing 10 pumps in Pluit Reservoir. In last rainy season, there were only 4 pumps operated due to limited genset power.

She explained that 10 pumps operation need electricity supply as much as 3,300 KVA. Two additional gensets will be able to accommodate the power to operate the pumps at the same time.

Linked News
Popular News indeks
  1. Pramono Flags Off 10,000 Runners at Soekarno Run 2026

    access_time15-02-2026 remove_red_eye1059 personFolmer
  2. Jakarta Unveils Indonesia’s First SDGs Corner at Maritime Museum

    access_time15-02-2026 remove_red_eye994 personNurito
  3. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye966 personAldi Geri Lumban Tobing
  4. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye928 personAldi Geri Lumban Tobing
  5. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye707 personAldi Geri Lumban Tobing